Challenge: AstraZeneca
needed additional space in its existing building – and they
needed to build up not out. Since the new space would serve as
the facility’s
new top floor, the interior and exterior had to mirror the
appearance and quality of the original
building. A zoned HVAC system and dry sprinkler system were required
and the addition had to be both cost effective and energy efficient.
Modular
Solution: Vanguard Modular constructed a permanent new third
floor for AstraZeneca’s facility. The interior and exterior
of the addition compliment the original building and Vanguard Modular’s
solution saved AstraZeneca about 50% compared to traditional construction.
A gas-fired HVAC system
and dry sprinkler were installed and the new space exceeds state
energy requirements. |