Education Facility Case Studies
 
Amherst College Dormitories
Amherst, Massachusetts
“We were surprised by the flexibility Vanguard Modular
demonstrated in adapting their construction schedule to accommodate the restrictions imposed by other activities on campus.”


Peter Root
Project Manager,
Amherst College
Amherst, Massachusetts

Challenge:
Swelling enrollments and limited time required quick construction of two new dormitories for the fall. Each building needed to hold 50 students, with full bathroom facilities and standard dorm amenities such as cable TV, high-speed internet, climate control and sprinklers in each room. They needed to be temporary additions, for use during renovations to existing dorms, but still blend with the campus.

Modular Solution:
Modular dormitory buildings solved both the space and time requirements at Amherst. The buildings were constructed at the factory for the most efficient delivery schedule. They were upgraded with 2x6 wall and floor construction, extra insulation and vinyl siding to blend with other buildings. Site work began in April and was completed in August, in time for fall semester students to move in.

 
Project Schedule:
Contract signed March 15
Site work begins April 1
Modular building manufacturing completed May 1
Modular building delivered May 30
Substantial setup completed July 24
Occupancy August 7
From Start to Finish 145 Days
 
Download Project PDF (File size 2.4 MB)
 
Hall-Dale Elementary School
Farmingdale, Maine

"We were favorably impressed with the quality construction of our temporary school building. Schiavi Leasing made it easy to quickly house our students and responded in a timely manner to all issues. We were even able to incorporate some of our own ideas into the building plans. If the need arose, we would be sure to contact Schiavi in the future."

Nora Murray
Superintendent
Hall-Dale Elementary School
Farmingdale, Maine

Challenge: The expanding population and desperate need for renovation of the 50-year old school created an immediate need for over 16,000 sq. ft. of elementary school space for 200 students. The Schiavi Leasing technical team needed to solve this crisis, on time and on budget.

Modular Solution: The solution was a complete turnkey project - including excavation, foundation, modular building design and construction, installation, landscaping and drainage, electrical, plumbing, fire alarm, data and communications wiring, a complete sprinkler system throughout the building, plus a heated connecting corridor to the adjacent school.

 
Project Schedule:
Contract signed June 21
Site construction/building drawings submitted June 30
Site work begins August 30
Modular building manufacturing completed September 7
Modular building delivered September 19
Occupancy October 10
From Start to Finish 110 Days
 
Download Project PDF (File size 136 kb)
 
Pentucket Regional School District
West Newbury, Massachusetts

“Vanguard Modular exceeded my expectations in every area and helped us meet a time frame that seemed impossible. If the need were to arise. I would have no hesitation about contacting Vanguard again.”

Richard O’Shea
Business Manager
Pentucket Regional School District
West Newbury, Massachusetts

Challenge: To accommodate a rapidly growing student population, Pentucket Regional School District required four 900 sq. ft. classrooms to be immediately added to their existing building. Each classroom required fire alarms and comprehensive data and communications wiring.

Modular Solution: Vanguard Modular delivered a complete turnkey solution – including excavation, foundations, modular building design and construction, installation, matching existing school floor level and brick exterior, landscaping and drainage, and providing compatible equipment and connections for existing fire alarm, intercom and computer data lines. The rooms were completed on time and at a fraction of the cost of traditional construction.

 
Project Schedule:
Date of award April 3
Site construction/building drawings submitted May 5
Site work begins June 30
Modular building manufacturing completed July 28
Modular building delivered August 2
Substantial setup completed August 31
From Start to Finish 150 Days
 
Download Project PDF (File size 112 kb)
 
Trinity Episcopal School
Charlotte, North Carolina

“Vanguard Modular’s understanding of the entire process, from building permit to certificate of occupancy, gave us confidence that the school would be ready in time. They delivered everything and finished the job to our complete satisfaction.”

Peter J. Conway
Board or Advisors
Trinity Episcopal School
Charlotte, North Carolina

Challenge: A temporary school was needed immediately while the community raised funds for a permanent school building. Specifications for the entire building needed to be developed by Vanguard Modular and working with the architect on the site plan was also a requirement.

Modular Solution: Vanguard Modular delivered a complete turnkey solution. Vanguard Modular was in charge of the building construction as well as the necessary electrical, plumbing and mechanical permits. Vanguard Modular’s role included building design and construction, site preparation, installation, decking, equipment and connections for the fire alarm, and all pre-wiring for the data and communications systems. Even with a re-zoning issue, the time from delivery to operational completion was just six weeks.

 
Project Schedule:
Date of signed contract March 23
Site construction/building drawings submitted March 30
Site work begins May 9
Modular building manufacturing completed June 27
Building permit issued July 7
Modular building delivered July 12
Substantial setup completed August 7
Occupancy August 23
From Start to Finish 152 Days
 
Download Project PDF (File size 132 kb)
 
Just want more information about your specific needs for a modular solution for your Education facility?
 
Contact Form
Find Your Local Sales Representative
 
 
Proud Member of the Modular Building Institute
National Association of Home Builders
GSA Contract Holder
 
1-877-GET-VMBS
 
Vanguard Modular Building Systems Headquarters:
3 Great Valley Parkway, Suite 170
Malvern, PA 19355
 
About Us | Why Modular? | Modular Solutions | Ready to Roll Solutions | GSA | Sales Locator
The Vanguard Modular Advantage | Schiavi Leasing Corp. | Contact Us | Home
 
       
   
Stay Informed! Sign up for FREE eUpdates.
 
 
       
    © 2009 Vanguard Modular Building Systems, LLC. All Rights Reserved  
    .