NetInsight Page Tag Vanguard Modular Building Systems
About Us
Why Modular?
Modular Solutions
GSA
GSA Statement of Qualifications
GSA Schedule Items
GSA Supply Schedule
GSA Ordering Activities
Past Performance
Floor Plans
Contact Us
Ready To Roll Solutions
Green Buildings
Home
 
 
GSA Schedule Items
361-10E Pre-Engineered and Prefabricated Buildings and Structures for Professional Facility Solutions
Restroom and Shower Building Floor Plan Image

Part Number: 1260
Product: Laboratory Trailer
Description*: Vanguard Modular’s Bio-Safety Level II Modular Laboratory is 720 square feet designed to be mobile and self-contained. Each unit is equipped with fresh water and wastewater storage tanks. HVAC equipment has been designed to provide once-through air and has HEPA filtration. The lab interior is finished with smooth F.R.P on walls and ceilings. Floors have a seamless trowled epoxy finish.
Price: Call your local representative for pricing.
Delivery: 90 days delivered ARO

361-10H Pre-Engineered and Prefabricated Buildings and Structures for Restroom, Shower and Laundry Solutions
Laboratory Trailer Floor Plan Image

Part Number: 1460
Product: Restroom/ Shower Building
Description*: Vanguard Modular’s modular restroom and shower facility is fully ADA-compliant and includes five lavatories, each with modesty partitions, and four shower stalls. 45@ single tier lockers and a janitor’s closet complete with sink and floor drains, are also included.
Price: Call your local representative for pricing.
Delivery: 90 days delivered ARO
* For specific building specifications, please refer to Vanguard Modular Building System’s building specification submittal, which should accompany your quote. For information regarding any variance from standard specifications, please contact your local Vanguard Modular Building Systems sales representative.

Part Number: FPSPRINKLER
Product: Sprinkler System for Flex Plex Buildings One and Two
Description*: Includes labor and materials necessary to design and install complete NFPA-13 “Wet Pipe” sprinkler system. All installed work shall comply with the requirements of NFPA-13.
Price**: Call your local representative for pricing.
Part Number: FPALARM

Product: Fire Alarm for Flex Plex Buildings One and Two
Description*: Includes fire alarm, detection systems, electrical wiring, conduit and associated labor.
Price**: Call your local representative for pricing.

* For specific building specifications, please refer to Vanguard Modular Building System’s building specification submittal, which should accompany your quote. For information regarding any variance from standard specifications, please contact your local Vanguard Modular Building Systems sales representative.
** Price does not include freight, delivery or any additional site work. Monthly lease rates are based on minimum lease terms.

361-50 Lease/Rental of Pre-Engineered/Prefabricated Buildings and Structures

FlexPlex Option A
Flex Plex Option A Floor Plan Image
FlexPlex Option B
Flex Plex Option B Floor Plan Image
FlexPlex Option C

FLex Plex Option C Floor Plan Image
FlexPlex Option D

Flex Plex Option D Floor Plan Image

Part Number: FPCOMPLEXA
Product: Flex Plex Building One
Description*: 10,752 square foot office complex comprised of 16@ modular units. Includes two bathrooms, both
ADA compliant.
Price**: Call your local representative for pricing.

Product: Flex Plex Building Two
Description*: 10,752 square foot office complex comprised of 16@ modular units. Includes two bathrooms, both
ADA-compliant. Additional cost options included in price – painted steel gutters and downspouts and a metal awning
above each porch deck.
Price**: Call your local representative for pricing.

Additional Cost Options:

Part Number: FPINSTALL
Product: Flex Plex Building Installation
Description*: Includes telephone and data wiring, telephone panel board, and fire alarm system. Price is per building complex.
Price**: Call your local representative for pricing.

Part Number: FPSKIRTING
Product: Flex Plex Skirting
Description*: Match siding. Price is per building complex.
Price**: Call your local representative for pricing.

Part Number: FPDECKS
Product: Flex Plex Wood Decks and Ramps
Description*: Includes 404 square feet of wood decks, ramps and steps per building complex.
Price**: Call your local representative for pricing.

Part Number: FPSPRINKLER
Product: Sprinkler System for Flex Plex Buildings One or Two
Description*: Includes labor and materials necessary to design and install complete NFPA-13 “Wet Pipe” sprinkler system. All installed work shall comply with the requirements of NFPA-13.
Price**: Call your local representative for pricing.

Part Number: FPALARM
Product: Fire Alarm for Flex Plex Buildings One or Two
Description*: Includes fire alarm, detection systems, electrical wiring, conduit and associated labor.
Price**: Call your local representative for pricing.

* For specific building specifications, please refer to Vanguard Modular Building System’s building specification submittal, which should accompany your quote. For information regarding any variance from standard specifications, please contact your local Vanguard Modular Building Systems sales representative.

** Price does not include freight, delivery or any additional site work. Monthly lease rates are based on minimum lease terms.

 
361-30 - Ancillary Services relating to Pre-Engineered/Prefabricated Buildings and Structures and 361-32 Installation and Site Preparation for Pre-Engineered/Prefabricated Buildings and Structures
1. Standard Set-Up – standard set-up for a single wide modular unit up to 60’ long. Standard installation of a 1,400 square foot building with 16” x 16” double drystack CMU piers (32” max. ht.) on 24” square ABS pads on grade. Install shall consist of interior and exterior seams. Floor seams shall be carpet bar. Ceiling seam shall be a 1” x 6” wood trim on a pre-finished gypsum ceiling. Wall seams shall be vinyl covered battens. Exterior shall be a 1” x 6” wood trim. Roof shall be EPDM. This price excludes any installation of roof vents, HVAC roof/pad mounted units or plumbing units. The cost also does not include any site work. The GSA price shown assumes the site is ready for the unit at the time of delivery.

2. Concrete Footings – cost includes pouring sub-grade footers. Does not include reinforcement.

3. Drystack CMU Piers – cost includes 16” x 16” double drystack to a maximum of 32” high. Additional height is an additional cost.

4. Anchors – Augured earth anchor; concrete embedded “minuteman” anchor or equal. Additional reinforcement is at an additional cost.

5. Deck installation – includes the cost of site-building a 5x5 deck with one step and one 30 ft. ramp with a maximum height of 30”. Deck is built new from treated wood. Anything larger then a 5x5, longer then a 30 ft. ramp, or higher then 30” would require additional cost.

6. Skirting installation – vinyl skirting with treated framing at a maximum height of 24”. Anything higher would require an additional cost.

7. Electrical Service – 400 amp NEMA disconnect mounted on the proposed modular building. Connected to 2@ 200 amp subpanels located in each modular unit. Sub-feeds from disconnect to subpanels shall be aluminum SER cable sized appropriately. Connection from existing power source to proposed disconnect is excluded. Cost does include building and ground rod.

8. Plumbing Service – manifold sanitary and potable water lines for 2@ handicapped single restrooms, consisting of 2@ water closets, 2@ lavatories, 1@ hot water heater, 1@ water cooler and 1@ coffee bar sink. Sanitary sewer shall be ABS/PVC piping and potable water shall be copper. Manifold shall be completed to a single point terminated in the crawl space of the proposed modular building. Connection from proposed single point termination to existing plumbing services is excluded. Heat tracing and insulation is also not included in the cost shown.

9. Fire Alarm Installation - furnish and install a stand alone fire alarm system consisting of 2@ manual pull stations, 2@ AV devices, 2@ smoke detectors, 1@ heat detector and 1@ main control panel. Cost also includes the panel having the ability to notify the fire department via dialer. Any additional pull stations, AV devices, smoke detectors, heat detectors or control panels will add additional cost.

10. Phone and Data – furnish and install 1@ CAT 5 phone/data drop in an existing single gang wall box with a conduit stub. Cable for drop shall be terminated in a phone/data room located in the proposed modular building. Maximum distance from drop to phone/data room shall be 25’ Punch Panel and connection to existing service is excluded. Additional drop boxes will add additional cost.

11. Site Superintendent – 1@ Vanguard Modular Buildings Systems representative on the site to supervise smooth execution of the project.

12. Engineered Foundation Plan – cost based on typical 1,440 square foot building; additional square footage could result in additional cost.

13. 30-yd. Dumpster – to handle standard construction debris. Anything requiring a crane or other means of removal will result in additional cost.

14. Temporary Restroom – the cost shown is for one porta-john on site. Additional porta-johns will result in additional cost.

15. Final Cleaning - the cost shown is for cleaning a standard 1,440 square foot building. Additional square footage will result in additional cost.

16. Building Teardown and Removal – End user/customer is responsible for removing all contents in the building. The building must be empty and broom swept by the end user/customer. A customer representative must be on site during teardown and removal. Vanguard Modular Building Systems will be responsible for removing the building. Any decks, ramps and skirting attached to the building is the customer's responsibility. The axles and hitches must be with the building at the time of removal.

Our Typical Installation Service Includes:

  • Block, level and seam building at truck-accessible, dry and level site.
  • Poured sub grade footers or
  • Anchors in dirt or
  • Anchors in asphalt
  • ADA compliant 5x5 deck with steps and handrails and 30’ handicapped ramp, not to exceed 4-step riser
  • OSHA compliant step and platform
  • Vinyl skirting up to 40” high

BASIS FOR OUR PRICING - SERVICES DESCRIPTION

Vanguard Modular Building Systems – Proposed Services Pricing for SIN 361-30 and 361-32

Vanguard Modular’s Construction and Engineering Division utilizes RSMeans to calculate hourly rates and material costs and other construction cost-related data on a regional basis.

 
GSA Contract Holder
 
 
Proud Supporter of the Wounded Warrior Project
Fort Meade Alliance Logo
SAME Sustaining Member Logo
 
703-349-6551
 
Vanguard Modular Building Systems Headquarters:
3 Great Valley Parkway, Suite 170
Malvern, PA 19355
 
About Us | Why Modular? | Modular Solutions | Ready to Roll Solutions | GSA |
The Vanguard Modular Advantage | Schiavi Leasing | Contact Us | Home
 
       
Proud Member of the Modular Building Institute  
Stay Informed! Sign up for FREE eUpdates.
 
 
       
    © 2009 Vanguard Modular Building Systems, LLC. All Rights Reserved.